As we were moving into the house, we encountered a small problem with the fridge - it didn't fit:
This was particularly frustrating, because our contractor had moved the lower cabinets a few inches specifically to accommodate our refrigerator. I had the movers put the fridge at the other end of the kitchen, so I had a place to store food. I waited to unpack the boxes that would go into any of the cabinets on that side of the kitchen, because I did not want to have to move everything again for our contractor to move the cabinets.
Our contractor came out to the house, prepared to move all the cabinets on one side of our kitchen. But first, he wanted to try putting the fridge in place himself. He had moved the lower cabinets to fit our measurement of the fridge and, somewhat remarkably, our measurement of the fridge matched his (we had a few measuring problems during this renovation). So, he gave it a try:
It fit perfectly. At least it was only a minor delay to my unpacking.